Projects completed and underway:
Welcome to the "Projects" section. Here you will find a selection of our most significant works in the construction and earthmoving sector. With years of experience and an unwavering dedication to quality, we have completed numerous projects ranging from residential and commercial construction to high-impact infrastructure. Each project was carried out with an unrivaled commitment to excellence, using cutting-edge techniques and strictly adhering to the agreed timescales and budgets. Find out more about our successes and be inspired by our ability to transform ideas into concrete and lasting realities.

SA/RC motorway: Year 2000/2002

Assignment from GEPCO – SALC Spa
for modernization and adaptation works to type 1/A of the CNR/80 standards section 1st SECTION 6th - LOT 4th from the Padula SA junction to the Calore torrent viaduct
amount of works €1,000,000.00.
Subcontracting Year 2003/2006

SAFAB Spa for completion works of the variant to the SS18 and 517 from Km 19+300 to the Buonabitacolo junction,
(Montesano S/M: Sewerage)
(Consilina Room: PIP Area)
amount of works carried out €1,500,000.00.

.jpg)
SA/RC motorway:
Year 2006 /2009
RUFOLI Scarl of the modernization and adaptation works of the type 1/b of the CNR/80 standards section
1st section 1st motorway junction for Avellino (recovery of materials from demolition operations, marine in tunnels)
amount of works carried out €5,000,000.00.
L'AQUILA 2007/2009

Creation of the road connection between the Campo Felice plain and the Rocche plateau (L'AQUILA) Assignment to Safab spa year 2007 – 2009 excavation works, earthmoving in general, tunnel clearance.
amount of works carried out €3,500,000.00.
.jpg)
.jpg)
SA/RC motorway: Year 2009/2013

Assignment by SIS Scpa of the modernization and adaptation works to type 1/A of the CNR/80 standards of the section from Km 108+000 to km 139+000
(demolition of viaducts, excavations, tunnel excavations, fills and embankments, crushing of materials, reinforced concrete works)
amount of work carried out to date €17,500,000.00 (in progress)
Grosseto - Fano (ANAS) 2024...
work in progress
.png)
The E78 Grosseto-Fano itinerary is approximately 276 km long in total and extends from the junction with the SS1 “Aurelia”, in Grosseto, to the junction with the A14 motorway in Fano, passing through Siena, Valdichiana/A1, Arezzo, Selci Lama/E45 and Urbino


SIS - Piedimontana Veneta 2024...
Work in progress!
High speed
State Railways 2024...
Work in progress!


Carrying out various earthmoving works to prepare for the excavation of the various tunnels and the reveiling of the ground. Construction sites present in various areas of Italy:
Lot 1/A Battipaglia-Romagnano al Monte (SA)
The Naples-Bari line is in fact one of the natural appendages of the Italian high speed (Apice-Hirpinia section, Grottaminarda cave)
Naples-Cancello (15.5 kilometres), or the origin of the new connection (Caserta)
Brenner (Isarco-Innsbruck Tunnel)


Our customers:
.png)
.png)

.png)



.png)


Administrative Headquarters Address:
Via Pantanelle, 45
84033 - Montesano sulla Marcellana (SA)
ITALY
Contacts:
email: info@adinolfigiovanni.com
Administration Headquarters
Tel.+39 0975-863396
Luca Adinolfi 338 4892100
Matteo Adinolfi 335 7239293
Giovanni Adinolfi 337 869970
Anagrafica Azienda:
Legal nature:
Limited Liability Company
VAT number: 04731480655
Tax code: 04731480655
ATECO code: 41.2
REA code: SA 389175
© 2024 IMPRESA ADINOLFI GIOVANNI s.r.l. Tutti i diritti riservati.
Tutti i contenuti presenti su questo sito, inclusi testi, immagini, loghi e design, sono protetti dalle leggi sul diritto d'autore e dalle altre leggi sulla proprietà intellettuale. È vietata la riproduzione, distribuzione, modifica o utilizzo non autorizzato del materiale presente su questo sito senza il previo consenso scritto di IMPRESA ADINOLFI GIOVANNI s.r.l.